RUS / ENG
 
    projects by functions      projects by years      high-rise projects     art     about us    


   23  22  21  20  19  18   17   16  15  14  13  12  11  10  09  08  07  06  05  04  03  02  01  00

Preliminary design of the embankment improvement in the Eastern bypass road of Khanty–Mansiysk city area (2017)

Project: 2017

Project leader: Saprichyan K.

Main project architect: Sinikov E.A., Silachyeva I.N.
Architects: Berezin V.I., Kalinin A.O., Kalinina V.A.
Ch. constructor: Shakhforostov A.A.
Constructor: Timofeyich A.

Total area: 7 hectares
  Draft design of the territory along the embankment of the Irtysh river in Khanty-Mansiysk, developed in accordance with the technical specifications agreed in the prescribed manner. The aim of the project is to develop on the basis of the analysis of the current state of the territory of the functional-planning and architectural-spatial concept of public urban space along the embankment of the Irtysh river.